Getting down to the wire

Two more inspections to go and we should be moving furniture, offices and more with the use of an elevator!

Painting is done except for touch ups,
railing moved into place

Windows stained, caulked and sealed.















Areas in the Bacon house have been emptied and cleaned for new purposes.
Side hall "carriage" door

Simmons Room--The Friends of the Library Reading Room


What used to be outdoors is now an interior wall!


The temporary ramp has been removed and grass is poking through in the newly seeded spots.


OPEN HOUSE OCT 19 as part of Wyandotte's 3rd Friday events. Both buildings will be open from 5:30 to 8:30 PM. A family storytime in the attic at 7PM and music in the Library from 7 to 8PM. REFRESHMENTS!!!













Monday, September 10, 2007

Finishing touches

It's been a long haul, but we are now looking at the LAST WEEK (weather permitting) of work on the elevator construction.



All the floor tile is in.








The painters are priming and applying first coats of paint to the walls and ceilings and staining the new woodwork.















We hope to have stair railing and treads in on Wednesday.
Thursday we plan to have some cement replaced out front and the Tattrie bench reinstalled on Friday.

Final elevator inspection on Friday if all goes as planned!


The demolition of the Wyandotte Theatre is almost complete...
One woman said she was picking up some bricks for a memory lane table at a class reunion!