More progress--part of the exterior walls are constructed and window openings taking shape for 3 on the north side of structure.
Opening to the 3rd floor entry coming off the landing--yet to be built.
And with all the work up above, the dumpsters get filled and replaced often even in a tight squeeze by the utility pole.
We are assured that steel work begins on Saturday and cement to be poured on Tuesday--as always weather permitting. They are carefully watching the sky today as it has gotten very overcast by 1PM and there is that chance of a thunderstorm.
No comments:
Post a Comment